D9006 - 1963

D9006 (1962).....D9006 (1964)

January

Click for current timetable

1 -  
2 -  
3 -  
4 -  
5 -  
s6 -  
7 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman".
8 -  
9 -  
10 -  
11 -  
12 -  
s13 -  
14 -  
15 -  
16 -  
17 -  
18 - 1E31 17:07 Hull - King's Cross, from Doncaster.
19 -  
s20 -  
21 -  
22 -  
23 -  
24 -  
25 - 1A49 16:55 Newcastle - King's Cross.
26 - 1A12 09:00 King's Cross - Newcastle. 
s27 -  
28 -  
29 -  
30 -  
31 -  

February

Click for current timetable

1 -  
2 -  
s3 -  
4 -  
5 -  
6 -  
7 -  
8 -  
9 -
s10 -  
11 -  
12 - To Doncaster Works - Light repair.
No shopping proposal - power units No.1 406 & No.2 425 remained in-situ, bogies No.1 1013 replaced by
1039 & No.2 1014 replaced by 1040 and boiler 1497/J2953 was overhauled. The body was given a
six-monthly exam and new primary fan shafts were fitted to both engines. No.1 exhaust collector tank
inspection lid and exhaust flexible pipe were fitted with new joints. A buffer was replaced at No.2 end and
the following modifications were carried out: Additional exhaust pipe filter; Additional compressor outlet
pipe bracket; Drivers vacuum brake valve
.
13 - Doncaster Works.
14 - Released from Doncaster Works.
15 -  
16 -  
s17 -  
18 -  
19 -  
20 -  
21 -  
22 -  
23 -
s24 -  
25 -  
26 -  
27 -  
28 -  

March

Click for current timetable

1 -  
2 - 1E02 07:00 Bradford - King's Cross, "The West Riding".
1A30 14:00 King's Cross - Edinburgh, "The Heart of Midlothian".
s3 -  
4 -  
5 -  
6 -  
7 -  
8 - 1E15 17:00 Bradford - King's Cross, from Leeds.
9 - 1E02 07:00 Bradford - King's Cross, "The West Riding".
s10 -  
11 -  
12 -  
13 -  
14 -  
15 - 1A47 13:30 Edinburgh - King's Cross, "The Heart of Midlothian".
16 -  
s17 -  
18 -  
19 -  
20 -  
21 -  
22 -  
23 - 1N10 10:20 King's Cross - Bradford. 
s24 -  
25 -  
26 -  
27 -  
28 -  
29 -  
30 -  
s31 -  

April

Click for current timetable

1 - 1A54 17:35 King's Cross - Newcastle.
2 - 1A49 16:55 Newcastle - King's Cross.
3 -  
4 -  
5 -  
6 -  
s7 -  
8 -  
9 - 1A30 14:00 King's Cross - Edinburgh, "The Heart of Midlothian"
10 - 1A39 09:30 Glasgow Queen St. - King's Cross.
11 - 1A47 13:30 Edinburgh - King's Cross, "The Heart of Midlothian".
12 - 1E07 10:25 Bradford - King's Cross (Sunday service).
13 -  
s14 -  
15 - 1D26 18:26 King's Cross - Doncaster.
16 - 1A12 09:00 King's Cross - Newcastle, to Doncaster.
1E15 17:00 Bradford - King's Cross, from Leeds.
17 - 1A21 09:40 Newcastle - King's Cross.
18 - 1A39 09:30 Glasgow Queen St. - King's Cross.
19 - 1A39 09:30 Glasgow Queen St. - King's Cross.
20 -  
s21 -  
22 -  
23 -  
24 -  
25 - 1E15 17:00 Bradford - King's Cross, from Leeds.
26 - 1A21 09:40 Newcastle - King's Cross.
27 -  
s28 -  
29 -  
30 -  

May

Click for current timetable

1 -  
2 -  
3 -  
4 - To Doncaster Works - Unclassified repair.
Derailment damage to No.2 bogie 1040 - fractured vacuum pipe elbows were replaced, the air pipes to the
warning horns were repaired, bogie rubbing straightened and a crack welded under brake hanger bracket.
Flashover damage to traction motors was also repaired
.
s5 - Released from Doncaster Works.
6 -  
7 -  
8 -  
9 -  
10 -  
11 -  
s12 - 1A35 10:50 Edinburgh - King's Cross (assisted from south of Peterborough by D5064).
13 -  
14 - 1A51 16:00 Edinburgh - King's Cross, "The Talisman".
15 -  
16 - 1A54 17:35 King's Cross - Newcastle.
17 -  
18 -  
s19 - To Doncaster Works - General repair.
No shopping proposal - power units No.1 406 replaced by 405 & No.2 425 replaced by 421, bogies No.1
1039 replaced by 1017 & No.2 1040 replaced by 1026 and boiler 1497/J2953 replaced by 5086/J3237. The
body was given an Annual repair and the following modifications were carried out: Soundproofing;
Radiator Grills; Exhaust drum tanks; Lubricating oil filters; Air supply and caustic injection to boiler feed
water
.
20 - Doncaster Works.
21 - Doncaster Works.
22 - Doncaster Works.
23 - Doncaster Works.
24 - Doncaster Works.
25 - Doncaster Works.
s26 - Doncaster Works.
27 - Doncaster Works.
28 - Doncaster Works.
29 - Doncaster Works.
30 - Doncaster Works.
31 - Doncaster Works.

June

Click for current timetable

1 - Doncaster Works.
s2 - Doncaster Works.
3 - Doncaster Works.
4 - Doncaster Works.
5 - Doncaster Works.
6 - Released from Doncaster Works.
7 -  
8 -  
s9 -  
10 -  
11 -  
12 -  
13 -  
14 -  
15 -  
s16 -  
17 - New timetable period.
18 -  
19 -  
20 -  
21 -  
22 -  
s23 -  
24 -  
25 -  
26 -  
27 -  
28 -  
29 -  
s30 -  

July

Click for current timetable

1 -  
2 -  
3 -  
4 -  
5 -  
6 -  
s7 -  
8 -  
9 -  
10 -  
11 -  
12 -  
13 -  
s14 -  
15 -  
16 -  
17 -  
18 -  
19 -  
20 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman" (with headboard). P.Ref
s21 -  
22 -  
23 -  
24 -  
25 -  
26 - To Doncaster Works - Unclassified repair.
No shopping proposal - No.2 wheelset was replaced.
27 - Doncaster Works.
s28 - Doncaster Works.
29 - Doncaster Works.
30 - Released from Doncaster Works.
31 -  

August

Click for current timetable

1 -  
2 - 1A07 Edinburgh - King's Cross (relief).
3 -  
s4 -  
5 - 1E15 17:00 Bradford - King's Cross, from Leeds.
6 -  
7 -  
8 -  
9 -  
10 - 1E14 11:00 Glasgow Queen St. - King's Cross, "The Queen of Scots Pullman" from Leeds.
s11 -  
12 -  
13 - To Doncaster Works - Unclassified repair.
Fuel tank holed on side due to action of 'Liquor 8' leaking from inlet pipe of dosing tank - No.1 right hand
fuel tank was welded and covered with fibreglass, No.2 main water tank was replaced. A temporary brake
hanger modification was fitted to brackets on bogies
.
Released from Doncaster Works.
14 -  
15 -  
16 -  
17 -  
s18 -  
19 -  
20 -  
21 -  
22 -  
23 -  
24 -  
s25 -  
26 -  
27 -  
28 -  
29 -  
30 -  
31 - 1N21 15:20 King's Cross - Bradford.
Also credited with 1A30 14:00 KX-Edin.

September

Click for current timetable

s1 -  
2 -  
3 -  
4 -  
5 -  
6 -  
7 - 1A47 13:30 Edinburgh - King's Cross.
s8 - 1A22 12:00 King's Cross - Glasgow Queen St.
9 - New timetable period.
10 -  
11 -  
12 - 1A35 10:00 Edinburgh - King's Cross, "The Flying Scotsman".
13 -  
14 - 1A21 10:15 Newcastle - King's Cross. PIC
s15 - 1A39 10:25 Glasgow Queen St. - King's Cross.
16 -  
17 -  
18 -  
19 -  
20 -  
21 -  
s22 -  
23 -  
24 -  
25 -  
26 -  
27 -  
28 -  
s29 -  
30 -  

October

Click for current timetable

1 -  
2 -  
3 -  
4 -  
5 - 1A16 10:00 King's Cross - Edinburgh, "The Flying Scotsman".
s6 -  
7 -  
8 -  
9 -  
10 -  
11 -  
12 -  
s13 -  
14 -  
15 -  
16 -  
17 -  
18 -  
19 -  
s20 - 1A32 14:00 King's Cross - Edinburgh.
21 -  
22 -  
23 -  
24 - To Doncaster Works - Modifications.
Boiler modifications were fitted and Automatic blowdown fitted.
25 - Doncaster Works.
26 - Released from Doncaster Works.
1B15 18:22 Doncaster - King's Cross.
s27 -  
28 -  
29 -  
30 -  
31 -  

November

Click for current timetable

1 - 1A16 10:00 King's Cross - Edinburgh, "The Flying Scotsman".
2 -  
s3 -  
4 -  
5 -  
6 -  
7 -  
8 -  
9 -  
s10 -  
11 -  
12 -  
13 -  
14 -  
15 -  
16 -  
s17 -  
18 -  
19 -  
20 -  
21 -  
22 -  
23 -  
s24 -  
25 -  
26 -  
27 -  
28 -  
29 -  
30 - 1A39 09:30 Glasgow Queen St. - King's Cross.

December

Click for current timetable

s1 -  
2 -  
3 -  
4 -  
5 -  
6 -  
7 - 1E02 07:00 Bradford - King's Cross, "The West Riding".
s8 - Finsbury Park TMD.
9 -  
10 -  
11 -  
12 -  
13 -  
14 - 1N10 10:20 King's Cross - Bradford.
s15 -  
16 -  
17 -  
18 - To Doncaster Works - Light repair.
No shopping proposal - power units No.1 405 & No.2 421 remained in-situ, bogies No.1 1017 replaced by
1025 & No.2 1026 replaced by 1018 and boiler 5086/J3237 was overhauled as were the water tanks. The
body was given a six-monthly examination
.
19 - Doncaster Works.
20 - Doncaster Works.
21 - Released from Doncaster Works.
s22 -  
23 -  
24 - 1A23 08:00 Edinburgh - King's Cross, "The Talisman".
25 -  
26 -  
27 -  
28 - 1A23 08:00 Edinburgh - King's Cross, "The Talisman" (locomotive giving problems at Peterborough).
s29 -  
30 -  
31 -  

D9006 (1962).....D9006 (1964)
1963.....HOME