D9003 - 1969
January
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| s5 - | |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| s12 - | |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| s19 - | Doncaster TMD. Tyre turning. |
| 20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | To Doncaster Works - unclassified. No.2 power unit 449 piston through crankcase on 'B' bank - 449 replaced by 428. Released from Doncaster Works. 0B02 Doncaster - Finsbury Park. Finsbury Park TMD. |
| 25 - | 1A33 15:15 Newcastle - King's Cross. |
| s26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | |
| 31 - |
February
| 1 - | |
| s2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| 7 - | |
| 8 - | |
| s9 - | |
| 10 - | To Doncaster Works - Unclassified repair. No.2 power unit 428 lubricating oil in coolant (suspect liner defect) - a sample of coolant was taken and coolant topped-up. Released from Doncaster Works. |
| 11 - | |
| 12 - | 1A42 16:00 King's Cross - Edinburgh, "The Talisman". |
| 13 - | |
| 14 - | |
| 15 - | |
| s16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| 22 - | |
| s23 - | 1A22 11:00 King's Cross Newcastle. |
| 24 - | |
| 25 - | To Doncaster Works - General repair. No shopping proposal - power units No.1 424 replaced by 405 & No.2 428 replaced by 447, bogies No.1 9000-43 replaced by 9000-41 & No.2 9000-44 replaced by 9000-42 and boiler 5094/J3245 replaced by 1496/J2952. The body was given a General repair. |
| 26 - | Doncaster Works. |
| 27 - | Doncaster Works. |
| 28 - | Doncaster Works. |
March
| 1 - | Doncaster Works. |
| s2 - | Doncaster Works. |
| 3 - | Doncaster Works. |
| 4 - | Doncaster Works. |
| 5 - | Doncaster Works. |
| 6 - | Doncaster Works. |
| 7 - | Doncaster Works. |
| 8 - | Doncaster Works. |
| s9 - | Doncaster Works. |
| 10 - | Doncaster Works. |
| 11 - | Doncaster Works. |
| 12 - | Doncaster Works. |
| 13 - | Doncaster Works. |
| 14 - | Doncaster Works. |
| 15 - | Doncaster Works. |
| s16 - | Doncaster Works. |
| 17 - | Doncaster Works. |
| 18 - | Doncaster Works. |
| 19 - | Doncaster Works. |
| 20 - | Doncaster Works. |
| 21 - | Doncaster Works. |
| 22 - | Doncaster Works. |
| s23 - | Doncaster Works. |
| 24 - | Doncaster Works. |
| 25 - | Doncaster Works. |
| 26 - | Doncaster Works. |
| 27 - | Released from Doncaster Works. |
| 28 - | 1E75 (engine failure). |
| 29 - | |
| s30 - | 1A50 17:45 King's Cross - Newcastle (engine failure). |
| 31 - |
April
| 1 - | To Doncaster Works - Rectification. No.1 power unit 405 cutting out, No.5 traction motor armature overheated, throwing solder and armature open circuit - the overspeed trip mechanism on 405 was replaced, all traction motors on No.2 bogie 9000-42 were examined (no fault was found). |
| 2 - | Released from Doncaster Works. |
| 3 - | |
| 4 - | |
| 5 - | |
| s6 - | |
| 7 - | |
| 8 - | To Doncaster Works - Rectification. No.1 bogie 9000-41 all traction motors light flashover damage & No.2 bogie 9000-42 No.4 traction motor burnt out and light damage toNo.5 traction motor - bogies No.1 9000-41 replaced by 9000-43 & No.2 9000-42 replaced by 9000-44. |
| 9 - | Doncaster Works. |
| 10 - | Released from Doncaster Works. |
| 11 - | |
| 12 - | |
| s13 - | 1A22 11:00 King's Cross - Newcastle. |
| 14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | 1A36 14:00 King's Cross - Edinburgh. |
| 19 - | |
| s20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | |
| s27 - | |
| 28 - | |
| 29 - | |
| 30 - |
May
| 1 - | |
| 2 - | |
| 3 - | |
| s4 - | |
| 5 - | New timetable period. |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| s11 - | |
| 12 - | |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| s18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | 1L33 17:05 King's Cross - Bradford. |
| s25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | |
| 31 - |
June
| s1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| 7 - | 1A33 17:20 Bradford - King's Cross. |
| s8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | 1S35 14:00 King's Cross - Edinburgh, to Darlington (engine failure). |
| 13 - | |
| 14 - | |
| s15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| 21 - | |
| s22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | |
| 27 - | |
| 28 - | |
| s29 - | |
| 30 - |
July
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| s6 - | |
| 7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| s13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| s20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| 26 - | |
| s27 - | |
| 28 - | |
| 29 - | |
| 30 - | |
| 31 - |
August
| 1 - | |
| 2 - | |
| s3 - | |
| 4 - | |
| 5 - | |
| 6 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
| 7 - | |
| 8 - | |
| 9 - | |
| s10 - | |
| 11 - | |
| 12 - | 1A35 17:00 Newcastle - King's Cross. |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| s17 - | |
| 18 - | |
| 19 - | To Doncaster Works - Unclassified repair. No.1 bogie 9000-43 No.2 traction motor armature pinion adrift (suspect key sheared) and all traction motors slight flashover damage, No.2 bogie 9000-44 No.5 traction motor contactor overload and all traction motors slight flashover damage - No.s 2, 5 & 6 traction motors were replaced and all others cleaned up. |
| 20 - | Released from Doncaster Works. |
| 21 - | |
| 22 - | To Doncaster Works - Rectification. All traction motors flashed over and AWS defective - No.1 & No.2 main generators had all brush boxes and commutators cleaned of flashover damage, all traction motors had flashover damage cleaned up. |
| 23 - | Released from Doncaster Works. |
| s24 - | |
| 25 - | |
| 26 - | To Doncaster Works - Unclassified repair. No.1 main generator slight flashover damage, No.2 main generator severe flashover damage and one insulation pot to change, No.1 bogie 9000-43 No.3 traction motor brush box cable disconnected, No.2 bogie 9000-44 No.5 traction motor flashover - No.1 main generator was replaced, flashover damage on No.2 main generator was repaired and insulators and brush boxes were changed. Flashover damage on traction motors was repaired. |
| 27 - | Doncaster Works. |
| 28 - | Doncaster Works. |
| 29 - | Doncaster Works. |
| 30 - | Doncaster Works. |
| s31 - | Doncaster Works. |
September
| 1 - | Doncaster Works. |
| 2 - | Released from Doncaster Works. |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| s7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | |
| s14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| s21 - | |
| 22 - | |
| 23 - | |
| 24 - | 1L33 17:05 King's Cross - Bradford. |
| 25 - | |
| 26 - | 1A03 07:00 Bradford - King's Cross. 1S32 12:00 King's Cross - Aberdeen, to Edinburgh. |
| 27 - | |
| s28 - | |
| 29 - | |
| 30 - | 1A09 08:40 York - King's Cross. |
October
| 1 - | |
| 2 - | |
| 3 - | |
| 4 - | 1S35 14:00 King's Cross - Edinburgh. |
| s5 - | |
| 6 - | |
| 7 - | |
| 8 - | |
| 9 - | |
| 10 - | |
| 11 - | |
| s12 - | |
| 13 - | |
| 14 - | |
| 15 - | |
| 16 - | |
| 17 - | |
| 18 - | |
| s19 - | |
| 20 - | |
| 21 - | |
| 22 - | |
| 23 - | |
| 24 - | |
| 25 - | |
| s26 - | |
| 27 - | |
| 28 - | |
| 29 - | |
| 30 - | |
| 31 - |
November
| 1 - | |
| s2 - | |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| 7 - | |
| 8 - | |
| s9 - | |
| 10 - | |
| 11 - | |
| 12 - | |
| 13 - | |
| 14 - | 1E11 12:00 Edinburgh - King's Cross. |
| 15 - | 1E05 10:00 Edinburgh - King's Cross, "The Flying Scotsman". |
| s16 - | |
| 17 - | |
| 18 - | |
| 19 - | |
| 20 - | |
| 21 - | 1A07 07:25 Newcastle - King's Cross. 1N25 17:00 King's Cross - Newcastle, "The Tees-Tyne Pullman". |
| 22 - | 1S17 10:00 King's Cross - Edinburgh, "The Flying Scotsman". |
| s23 - | |
| 24 - | |
| 25 - | |
| 26 - | 1S35 14:00 King's Cross - Edinburgh. |
| 27 - | |
| 28 - | |
| 29 - | |
| s30 - |
December
| 1 - | |
| 2 - | 1N06 07:55 King's Cross - Newcastle. |
| 3 - | |
| 4 - | |
| 5 - | |
| 6 - | |
| s7 - | |
| 8 - | |
| 9 - | To Doncaster Works - Light repair. No shopping proposal - power units No.1 405 & No.2 447 were given Unclassified repairs, bogies No.1 9000-43 replaced by 9000-11 & No.2 9000-44 replaced by 9000-12 and boiler 1496/J2952 was given an Unclassified repair and water tank capacity modification was carried out. |
| 10 - | Doncaster Works. |
| 11 - | Doncaster Works. |
| 12 - | Doncaster Works. |
| 13 - | Doncaster Works. |
| s14 - | Doncaster Works. |
| 15 - | Doncaster Works. |
| 16 - | Doncaster Works. |
| 17 - | Doncaster Works. |
| 18 - | Released from Doncaster Works. |
| 19 - | |
| 20 - | |
| s21 - | |
| 22 - | |
| 23 - | To Doncaster Works - Unclassified repair. No.2 power unit 447 main generator defective - 447 replaced by 434. |
| 24 - | Doncaster Works. |
| 25 - | Doncaster Works. |
| 26 - | Doncaster Works. |
| 27 - | Doncaster Works. |
| s28 - | Doncaster Works. |
| 29 - | Doncaster Works. |
| 30 - | Doncaster Works. |
| 31 - | Released from Doncaster Works. 1A11 08:55 Hull - King's Cross, from Doncaster (piloting D1660). |
D9003
(1968).....D9003 (1970)
1969.....HOME